Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Lower Cowiche Creek Trail #2430

Awarded contract·City of Yakima·Washington

Lower Cowiche Creek Trail #2430

$2.1MAwarded 5/12/2023Single Award
Contract source

Description

The Lower Cowiche Creek Trail project is a multi‑million‑dollar civil‑engineering effort to construct a new trail corridor in Yakima County, Washington. The scope includes detailed surveying, extensive clearing and grubbing, earthwork (excavation, borrow, embankment compaction), shoring for bridge abutments and piers, dewatering, imported backfill, geotextile installation, crushed surfacing, reinforced steel for a pedestrian bridge, fish exclusion structures, erosion control, high‑visibility silt fencing, and seeding/fertilizing/mulching. Competitive bids were received from seven regional contractors, each required to submit a 5 % bid bond. The base‑bid values range from approximately $1.39 M to $2.61 M, with additive items adding $0.12 M to $0.30 M, yielding total potential contract values between $1.5 M and $2.85 M. The procurement was conducted under State‑Aid (HLP‑1485(024)) and follows a full‑open competition process. No award has been finalized in the available excerpt. • Comprehensive trail construction covering earthwork, structural, geotechnical, and environmental mitigation. • Base‑bid plus additive schedule allowing optional scope items. • Competitive field of seven qualified contractors, each posting a 5 % bid bond. • Project funded through State‑Aid, indicating compliance with state grant requirements. • No award decision disclosed; contract values estimated between $1.5 M and $2.9 M.

Attached files

Key dates

Bids closed
5/12/2023
Intent to award
5/12/2023
Awarded
5/12/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
HLP‑1485(024)

Contract value

$2,100,000

The bid summary lists base‑bid totals ranging from $1.39 M to $2.61 M and additive‑A totals ranging from $0.12 M to $0.30 M. Assuming the eventual award will fall within this range, the contract’s probable value lies roughly between $1.5 M and $2.9 M. Taking a mid‑point estimate to represent a typical award value, the contract can be approximated at about $2.1 M. This estimate reflects the combined scope of extensive earthwork, structural steel, geotechnical materials, and environmental mitigation.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Cobb County·Georgia

Top match · 63%

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Environmental Conservation, NYS Department of·New York

62% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

Kenosha County·Wisconsin

61% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Connecticut Town of Simsbury·Connecticut

61% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Minnesota Department of Administration·Minnesota

61% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Transportation·Washington

60% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

County of Fairfax·Virginia

60% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Green Bay·Wisconsin

60% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Delaware County·Pennsylvania

60% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

City of Goshen, Indiana·Indiana

60% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Maryland Howard County Government·Maryland

59% match

IFB-2027-19 PATUXENT BRANCH TRAIL IMPROVEMENTS

Closes 12/23/2026Opened 10/24/2026

U.S. Department Of Transportation·Idaho

59% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 11/13/2026Opened 10/13/2026

SC Forestry Commission·South Carolina

59% match

Wambaw Trail Maintenance and Grooming

Closes 11/5/2026Opened 10/14/2026

City of Cincinnati·Ohio

59% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

South Carolina Forestry Comm·South Carolina

59% match

WAMBAW TRAIL MAINTENANCE AND GROOMING

Closes 11/5/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

59% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Maryland Department of Natural Resources·Maryland

59% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

58% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

California Grants·California

58% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

City of Cincinnati·Ohio

58% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Iowa City·Iowa

58% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

Connecticut City of Middletown·Connecticut

58% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Harris County·Georgia

58% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Alaska Department of Natural Resources, Division of Mining, Land and Water·Alaska

58% match

Public Notice - Proposed Winter-only Public Access Easements for Snowmachines Near Wiseman within the Dalton Highway Corridor.

Closes 11/8/2026Opened 10/7/2026

Haines Borough·Alaska

58% match

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026