This contract calls for the complete demolition and site remediation of a damaged wood‑frame structure at 212 Norman Street, Mobile, AL. The contractor must perform wet demolition, cap and disconnect utilities, remove all debris, handle lead‑based paint and asbestos in compliance with EPA/NESHAP regulations, install temporary erosion‑control BMPs, and complete permanent site stabilization (top‑soiling, seeding, mulching). All work must be finished within fifteen calendar days after receiving a notice to proceed, with penalties of $250 per day for delays. The vendor is required to provide insurance, E‑Verify proof, and complete extensive close‑out documentation including photographs, waste‑shipment records, and a newspaper notice of final completion.
• Wet demolition of the existing structure with removal of footings, slabs, and surrounding vegetation.
• Utility disconnection and capping for sewer, water, and gas lines.
• Hazardous‑material handling (lead‑paint, asbestos) and full debris disposal to permitted facilities.
• Erosion/sediment control BMPs and final site stabilization with seeding/mulching.