The City of Richland is seeking bids for the George Washington Way Pavement Preservation project. The project includes the construction of approximately 4.7 road miles of 'mill and fill' on George Washington Way between Guyer and Horn Rapids Road, including planing existing asphalt, crack sealing, HMA surfacing, pavement markings, ADA ramp installation, sidewalk and curb replacement, traffic signal replacement, miscellaneous beautification, and overall site restoration. The contract has several schedules, including a base bid, traffic signal work, Battelle miscellaneous work, water utility work, and sewer utility work. There are also several alternatives, including a Corps of Engineers drainage area beautification, east side sidewalk expansion, west side sidewalk expansion, and fiber reinforcement for HMA. The contract has a grand total of $5,072,953.44 for the base bid.