Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Swift Boulevard Corridor Improvements Re-Bid

Awarded contract·City of Richland·Washington

Swift Boulevard Corridor Improvements Re-Bid

Won by Morgio & Nelson +4 more$2.3MMultiple Award
Contract source

Awarded vendors

  • Morgio & Nelson
  • BSD Construction
  • Tapani
  • Culbert
  • Apollo

Description

The City of Richland is seeking bids for the Swift Boulevard Corridor Improvements Re-Bid project. The project includes removal of structures and obstructions, roadway excavation, planing/grinding existing asphalt pavement, placement of crushed surfacing, water and sewer main lines and services, new conduit placement, concrete curb, gutter and sidewalks, ADA ramps, street light system, traffic signal systems, and surfacing with hot mix asphalt. The estimated cost of the project is $2,300,000. The bid tabulation document lists several vendors with their corresponding bid amounts. • The project is estimated to cost $2,300,000. • The bid tabulation document lists several vendors with their corresponding bid amounts. • The project includes various construction activities such as roadway excavation, planing/grinding existing asphalt pavement, and placement of crushed surfacing. • The City of Richland is seeking bids from disadvantaged business enterprises.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237310
Solicitation №
18-0015

Contract value

$2,300,000

The contract’s dollar amount value can be estimated based on the estimated cost of the project, which is $2,300,000. The bid tabulation document lists several vendors with their corresponding bid amounts, with the lowest bid being $2,274,435.68. Therefore, the contract value is likely to be around $2,300,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Austin·Texas

Top match · 73%

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Virginia Department of Transportation·Virginia

72% match

B11_2027 SMART SCALE CORRIDOR IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

LA Public Works Engineering Bureau·California

71% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Austin·Texas

70% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

City of Charlotte·North Carolina

69% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

69% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Dayton·Ohio

68% match

Patterson Boulevard Rehabilitation

Closes 11/12/2026Opened 10/29/2026

City of Fort Wayne·Indiana

68% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

Massachusetts City of Brockton·Massachusetts

68% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

Lakesong Municipal Management District No. 1 of Ellis County·Texas

68% match

Lakesong Huffines Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/20/2026

County of San Luis Obispo·California

68% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

Nevada Government·Nevada

68% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

67% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

City of Richmond Government·Virginia

67% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of San Antonio·Texas

67% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

NYS East Fishkill, Town of·New York

67% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of San Antonio·Texas

67% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Charlotte·North Carolina

67% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

Nevada Government·Nevada

67% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

North Carolina Town of Knightdale·North Carolina

67% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Ohio City of Westerville·Ohio

66% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Cedar Rapids·Iowa

66% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

County of Los Angeles Department of Public Works·California

66% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Murfreesboro·Tennessee

66% match

ADA Improvements for Patterson Park and MPD

Closes 11/12/2026Opened 10/20/2026

Lakesong Municipal Management District No. 1 of Ellis County·Texas

66% match

Lakesong Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/19/2026