The Foothill Raw Water Pipeline Phase 2 project involves the construction of a 33 to 48-inch raw water pipeline and an 18-inch treated water pipeline. The project includes trench excavation, bedding and backfill, pipe boring and jacking, fittings, valves, and appurtenances. The project also involves the removal of two raw water and treated water pipe interties, piping and valving at the Newcastle Tank, and connections to existing piping. The contract was awarded through a competitive bidding process, with several contractors submitting bids. The project manager's estimate for the project was $18,206,000.
• The project involves the construction of a raw water pipeline and a treated water pipeline.
• The project includes trench excavation, bedding and backfill, and pipe boring and jacking.
• The project involves the removal of two raw water and treated water pipe interties.
• The project requires connections to existing piping and compliance with environmental requirements.
• The contract was awarded through a competitive bidding process.
• The project manager's estimate for the project was $18,206,000.