The UDOT SR-210 Barrier Replacement Project involves replacing guardrail with pinned precast concrete barrier, removing rolled gutter and installing storm inlets and outfalls, and placing rolled gutter on the westbound side of the road. The contract was awarded to Trapp Construction LLC, the lowest responsive and responsible bidder. The project requires the contractor to submit a performance and payment bond upon award. The contract has a lump sum total of $195,295.00 for the project. The contractor must acquire and maintain all applicable federal, state, and local licenses before the contract is entered into. The contract also requires the contractor to provide a point-by-point response to the mandatory minimum requirements and upload a document providing this response. Some of the key points from the evaluation of bids include:
• The total bid for the project from each bidder,
• The subtotal for required items,
• The subtotal for optional items,
• The unit price for each item,
• The estimated delivery date for each item.
The evaluation also includes a comment section where bidders can provide additional information.