The Emergency Dune Restoration project involves the restoration of portions of the Flagler County dune system. The project requires the construction of a 20 ft wide dune with a crest elevation of +14 ft-NAVD88 and 5H:1V slopes, as well as the purchase, handling, transport, delivery, and placement of sand and dune vegetation. The project must be fully compliant with the Americans with Disabilities Act (ADA). The contract documents include a bid form, project plans, and addendums.
• The project area extends approximately 58,000 feet south from FDEP reference monument R-4.5 to FDEP reference monument R-65.
• The project requires mobilization/demobilization, preparation and restoration of the work site and access points, and performance of all operations and surveys in connection with the construction.
• The contract documents include a bid form, project plans, and addendums.
• The project must be fully compliant with the Americans with Disabilities Act (ADA).
• A non-mandatory pre-bid meeting was held on April 12, 2017, to discuss the project and answer questions.