Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Water and Wastewater
  5. ›Ingalls Kingsley Water Main Project

Awarded contract·City of Ann Arbor·Michigan

Ingalls Kingsley Water Main Project

Won by Bailey Excavating$4.2MSingle Award
Contract source

Awarded vendors

  • Bailey Excavating

Description

The City of Ann Arbor is constructing a new water‑main system with associated storm‑sewer, roadway, curb, and site‑restoration improvements along East Kingsley Street and North Ingalls Street. The project is divided into three phases, must start on or after May 1 2026 and be completed by October 15 2026, and includes liquidated damages of $1,500 per day for late completion. The solicitation required extensive documentation (prevailing‑wage, living‑wage, non‑discrimination declarations) and a 5 % bid bond. The contract will be awarded under a unit‑price schedule covering water‑main pipe, valves, storm‑sewer ties, HMA paving, traffic‑control, and restoration items. • Scope: new water‑main installation, storm‑sewer tie‑ins, HMA overlay, curb/sidewalk work, utility removal, traffic‑control, and site restoration. • Schedule: May 1 – Oct 15 2026 with holiday and UM football‑game work restrictions; $1,500/day liquidated damages. • Procurement: Open competition RFP 26‑12; tentative award to Bailey Excavating; bid security 5 % of total bid; performance and labor‑and‑material bonds required.

Attached files

Key dates

Questions due
2/13/2026
Pre-bid meeting
2/11/2026
Bids closed
2/26/2026
Starts
5/1/2026
Ends
10/15/2026
Duration
5 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Request for Proposal
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
RFP 26-12

Contract value

$4,200,000

The proposal tabulation lists five bids ranging from $3.95 M to $4.77 M, with the lowest bid (Eminent Excavating) at $3,949,151.85 and the tentative award going to Bailey Excavating (bid amount not disclosed but likely in the same range). Given the engineer’s cost estimate of $2 M and the extensive scope (water‑main, storm‑sewer, HMA paving, traffic control, and site restoration), a realistic contract value is in the mid‑$4 million range. Assuming the awarded bid is near the median of the submitted bids, an estimated contract value of approximately $4.2 million is reasonable.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Northern Kentucky Water District·Kentucky

Top match · 69%

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Town of Eatonville·Florida

69% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Northern Kentucky Water District·Kentucky

68% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

Lansing Board of Water & Light·Michigan

67% match

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations (Dunlap, Astor, Berry, Palmer, Tenny

Closes 11/24/2026Opened 10/23/2026

Catawba Regional Council of Governments·South Carolina

67% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Town of Smithtown·New York

67% match

Water Main Oakside & Landing

Closes 12/3/2026Opened 10/23/2026

CPPJ- Special Service Districts·Louisiana

67% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Edgewater, FL·Florida

67% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Florida Governmental Utility Authority·Florida

67% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

Georgia Rockdale County Board of Commissioners·Georgia

66% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026

Massachusetts Town of Plymouth·Massachusetts

66% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

Gwinnett County Government·Georgia

66% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

City of Lake City and City of Bellechester·Minnesota

66% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Oak Manor Municipal Utility District·Texas

66% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

Hastings Utilities·Nebraska

66% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of DeLand·Florida

65% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Town of Cutler Bay·Florida

65% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

City of Riverside·California

65% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Oregon City of Ashland·Oregon

65% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of McCook·Nebraska

65% match

South 3rd Street Water System Improvements

Closes 11/10/2026Opened 10/21/2026

U.S. Department Of The Interior·California

65% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

Georgia Gwinnett County·Georgia

65% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Santa Maria-Bonita School District·California

65% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Clermont County - Board of Commissioners·Ohio

65% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Red Oak·Texas

65% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026