The Santa Fe County Public Works Department contracted WSP to provide full‑service civil/transportation engineering design for the CR‑55A (General Goodwin Road) improvement project. The scope covers a complete study, preliminary and final design packages, construction‑phase engineering services, and an 11‑month post‑construction warranty inspection for roughly 2.17 mi of county road, including drainage, flood‑plain, right‑of‑way, and utility coordination. The contract is structured as a professional‑services agreement with fee percentages allocated across study, design, bidding, construction‑phase, and close‑out phases, and runs for an estimated two‑year period beginning late 2024.
• Design phases include data collection, geotechnical and drainage studies, 30 % preliminary design, full PS&E, NPDES & FEMA applications, and construction‑phase inspection.
• The County supplies the “previous design” for reference and requires compliance with 2019 NMDOT specs, local flood‑plain regulations, and Santa Fe County sustainable land‑development standards.
• Evaluation criteria total 1,000 points plus preference points for in‑state, veteran‑owned, and county‑registered businesses; insurance minimums of $1 M general liability and $1.5 M professional liability are mandatory.