Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›FULTON AVENUE OVERLAY PHASE 2: ARDEN WAY TO AUBURN BLVD…

Awarded contract·County of Sacramento - Department of Transportation·California

FULTON AVENUE OVERLAY PHASE 2: ARDEN WAY TO AUBURN BLVD FEDERAL AID PROJECT STPL 5924 (220)

Won by Teichert Construction$3.9MSingle Award
Contract source

Awarded vendors

  • Teichert Construction

Description

The contract is for the construction of the Fulton Avenue Overlay Phase 2, Arden Way to Auburn Boulevard Project in Sacramento, CA. The project includes the furnishing of all labor, materials, and equipment for doing all of the work associated with street roadway asphalt concrete overlay, construction of new curbs, gutters, sidewalks, driveways in infill areas, and traffic signal modification at various locations. The estimated construction cost is $3,950,000.00, and the contract was awarded to Teichert Construction in the amount of $3,866,298.00. The contract is a federal aid project, and the contractor is required to have a General Engineering Contractor, Class A license. Some key aspects of the project include: • Roadway work: placing rubberized asphalt concrete pavement overlay, slurry seal, repairing failed pavement, grinding the pavement to accommodate the overlay, adjusting manholes to grade, placing thermoplastic striping, markings, and markers. • Construction of ADA compliant pedestrian crossing, including new curbs, gutters, and sidewalks. • Construction of Type A driveways, median removal/reconstruction, street drainage modification, installation/relocation of street lights. • Traffic signal modification: replacing loop detectors signal detection system with Video/Radar Hybrid Signal Detection System, relocating selected Type 1B signal poles, installing mast arm signal poles, and major traffic signal modification at intersection of Fulton Ave @ Edison Ave.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
4301

Contract value

$3,866,298

The contract value is explicitly stated in the document as $3,866,298.00, which is the amount awarded to Teichert Construction for the Fulton Avenue Overlay Phase 2 project. This value is likely to be the total contract value, as it includes all the work associated with the project. The estimated construction cost is $3,950,000.00, but the actual contract value is lower, likely due to the competitive bidding process.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

State of Delaware DOT·Delaware

Top match · 70%

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of Vernon·California

69% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

The City of Anaheim·California

69% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

Idaho Transportation Department·Idaho

68% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Municipality of Anchorage·Alaska

68% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Fort Wayne·Indiana

68% match

0792D - Alley N-S: Lenox Ave, W Fairfax Ave, Buell Dr, Fairfield Ave

Closes 11/5/2026Opened 10/23/2026

City of Alma·Arkansas

68% match

Alma Southside Sidewalk Improvements

Closes 11/10/2026Opened 10/18/2026

Ohio City of Westerville·Ohio

68% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of North Augusta·South Carolina

68% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

Texas City of San Antonio·Texas

68% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Tacoma·Washington

67% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

Calhoun County Board of County Commissioners·Florida

67% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Flowood·Mississippi

67% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

City of Torrance·California

67% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of San Antonio·Texas

67% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

67% match

Ames Blvd. Lighting: From Lapalco Blvd. to Barataria Blvd

Closes 12/3/2026Opened 10/14/2026

City of Fort Wayne·Indiana

67% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Austin·Texas

67% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

City of Palmdale·California

67% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026

City of Fresno·California

67% match

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension

Closes 11/10/2026Opened 10/9/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

County of Okaloosa·Florida

67% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

U.S. Department Of Defense·Missouri

67% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Town of Upton·Wyoming

67% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Fresno·California

66% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026