The contract is for the construction of the Fulton Avenue Overlay Phase 2, Arden Way to Auburn Boulevard Project in Sacramento, CA. The project includes the furnishing of all labor, materials, and equipment for doing all of the work associated with street roadway asphalt concrete overlay, construction of new curbs, gutters, sidewalks, driveways in infill areas, and traffic signal modification at various locations. The estimated construction cost is $3,950,000.00, and the contract was awarded to Teichert Construction in the amount of $3,866,298.00. The contract is a federal aid project, and the contractor is required to have a General Engineering Contractor, Class A license. Some key aspects of the project include:
• Roadway work: placing rubberized asphalt concrete pavement overlay, slurry seal, repairing failed pavement, grinding the pavement to accommodate the overlay, adjusting manholes to grade, placing thermoplastic striping, markings, and markers.
• Construction of ADA compliant pedestrian crossing, including new curbs, gutters, and sidewalks.
• Construction of Type A driveways, median removal/reconstruction, street drainage modification, installation/relocation of street lights.
• Traffic signal modification: replacing loop detectors signal detection system with Video/Radar Hybrid Signal Detection System, relocating selected Type 1B signal poles, installing mast arm signal poles, and major traffic signal modification at intersection of Fulton Ave @ Edison Ave.