The Palm Bay Colony Drainage Improvements contract involves the removal and replacement of existing corrugated metal pipes with larger diameter reinforced concrete pipes, as well as the installation of turf reinforcement mats for slope stabilization. The project aims to improve the overall stormwater management of the area. The contract was awarded to five vendors: Don Facciobene Inc, Gregori Construction & Engineering Inc, GUNNstruction LLC, JD Sunny Isle Inc, and Jobear/Warden Construction. The contract has a grand total value of $146,040.00 for one of the vendors.
• The project consists of three locations: Huckleberry Lane, Ersoff Boulevard, and Silk Tree Lane.
• The contract includes the removal and restoration of roadway pavement and fencing within the project area.
• The vendors are required to provide unit prices for various items, including mobilization, rolled erosion control products, sediment barrier/silt fence, and concrete class I endwalls.
• The contract has a total of 50 items, including pipe culvert, RCP, fencing, type B, and performance turf, sod.