Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Harvest Water Central-South Pipelines

Awarded contract·Sacramento Regional County Sanitation District - Treatment and Resource Recovery·California

Harvest Water Central-South Pipelines

Won by Ranger Pipelines Incorporated +4 more$49MMultiple Award
Contract source

Awarded vendors

  • Ranger Pipelines Incorporated
  • Mountain Cascade, Inc.
  • Sukut Construction, LLC
  • Steve P. Rados, Inc.
  • Garney Pacific, Inc.

Description

The contract is for the construction of approximately 16 miles of a mixture of welded steel and HDPE pipelines in rural Southern Sacramento County roads. The project includes three trenchless crossings, numerous air valves, blowoffs, buried access manways, isolation valves, and turnout connections. The contract is valued at $49,000,000, and the work is expected to be completed within a certain timeframe. The contractor will be responsible for furnishing all labor, materials, and equipment necessary for the project. The contract also includes provisions for mobilization and demobilization, environmental fencing, and SWPPP implementation and maintenance.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
6024

Contract value

$49,000,000

The contract value is estimated to be $49,000,000, based on the engineer's estimate provided in the contract documents. This value is likely to be the total cost of the project, including all labor, materials, and equipment necessary for the construction of the pipelines.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Tarrant Regional Water District·Texas

Top match · 66%

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Columbus Ohio·Ohio

64% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of DeLand·Florida

64% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

U.S. Department Of The Interior·Utah

64% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Mississippi

64% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

The Metropolitan Water District of Southern California·California

64% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of San Bernardino·California

63% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

Eastern Municipal Water District·California

63% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of DeLand·Florida

63% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Edgewater, FL·Florida

63% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Beaumont·California

63% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

U.S. Department Of Defense·California

63% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

Eastern Municipal Water District·California

63% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Austin Energy (City of Austin)·Texas

63% match

2026 IDIQ Chilled Water Construction In The ROW Reissue

Rolling / TBD closeOpened 8/31/2026

Massachusetts City of Haverhill·Massachusetts

62% match

South Mill Street Pump Station Header Piping Replacement

Closes 11/5/2026Opened 10/21/2026

Citrus County - Board of County Commissioners·Florida

62% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

Town of Eatonville·Florida

62% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Austin·Texas

62% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

San Antonio Water System·Texas

62% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

South Tahoe Public Utility District·California

62% match

Engineering Services for Water System and Sewer Collection System Strategic Plans

Closes 12/11/2026Opened 10/27/2026

City of Red Oak·Texas

62% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026

City of Cortez·Colorado

62% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026