The City of Rock Hill has awarded a contract to Sanders Utility Construction Company, Inc. for the Wildcat Creek Force Main Relocation/Conveyance project. The project involves the installation of a 36-inch diameter force main and a 36-inch diameter gravity sewer. The contract has a duration of 390 days and a budget of $6,476,180. The project is located in Rock Hill, South Carolina, and the contractor will be responsible for the design and construction of the project. Key aspects of the project include the relocation of the force main and gravity sewer, the installation of new pipes, and the connection to existing infrastructure. The project will require the contractor to excavate and backfill trenches, install pipes, and connect to existing infrastructure. The contractor will also be responsible for ensuring that the project is completed in accordance with the contract documents and that all necessary permits and approvals are obtained.
• The project involves the installation of a 36-inch diameter force main and a 36-inch diameter gravity sewer.
• The contract has a duration of 390 days and a budget of $6,476,180.
• The project is located in Rock Hill, South Carolina.
• The contractor will be responsible for the design and construction of the project.
• The project will require the contractor to excavate and backfill trenches, install pipes, and connect to existing infrastructure.
• The contractor will also be responsible for ensuring that the project is completed in accordance with the contract documents and that all necessary permits and approvals are obtained.