This contract awards a municipal utility improvement project to construct new and abandon existing storm‑water, water, and sanitary sewer utilities along Museum Avenue in Dothan, Alabama. The scope includes installation of high‑pressure storm pipes, ductile‑iron water mains, PVC sanitary sewer lines, associated manholes, inlets, valve boxes, traffic control, pavement demolition and resurfacing, and related permitting and environmental compliance. The base‑bid amount was $2.04 M, later adjusted by a $216 K change order to a final contract value of $1.83 M. The contractor is responsible for mobilization, excavation, backfill, concrete work, asphalt paving, and all required as‑built documentation.
• Scope covers storm‑water, potable water, and sanitary sewer infrastructure replacement and upgrades.
• Lump‑sum contract with a $95 K additive alternate for vibration control and a $216 K reduction via change order.
• Project schedule: 120 days to substantial completion, 170 days to final payment, with a mandatory pre‑bid conference and sealed‑bid submission.