The contract is for the installation of conduits in Grindstone, Missouri. The scope of work includes the installation of various sizes of PVC and RMC conduits, bore-pipes, and elbows, as well as trenching and directional boring. The contract also includes the provision of mobilization and setup costs. The city received bids from several vendors, and the lowest bidders for each item are listed in the bid tabulation.
• The contract includes the installation of 3", 4", and 5" PVC conduits
• The contract includes the installation of 3" and 5" RMC conduits
• The contract includes the installation of 3" and 5" bore-pipes
• The contract includes the provision of trenching and directional boring services
• The contract includes the provision of mobilization and setup costs