The City of Temple is seeking a construction contract for the rehabilitation and replacement of the Bird Creek Interceptor, a wastewater interceptor located in the Midway neighborhood of Temple, TX. The project involves the installation of approximately 8,500 linear feet of 30" gravity sewer pipe, 820 linear feet of 24", 10", or smaller gravity sewer pipes, and the rehabilitation of existing manholes. The project also includes trenchless construction methods, such as tunneling and auger boring, and the installation of bypass pumping plans. The contract has a base bid of $21,509,238.99, and there are several alternate bids that replace or add to certain bid items. The project is expected to take approximately 2.5 years to complete.
• The project involves the installation of new sewer pipes and the rehabilitation of existing manholes.
• The project includes trenchless construction methods, such as tunneling and auger boring.
• The contract has a base bid of $21,509,238.99, with several alternate bids.
• The project is expected to take approximately 2.5 years to complete.
• The project requires the installation of bypass pumping plans.
• The project involves the relocation of existing utilities, such as water lines.
• The project requires the removal and replacement of existing manholes.
• The project involves the installation of new manholes, including fiberglass manholes.