Brannan Construction Company & Hamon Infrastructure, Inc.
[blank]
Description
This three‑year, maximum‑$3.25 million contract provides multi‑event, as‑needed support for Denver’s wastewater infrastructure projects, covering pipe replacement, cured‑in‑place lining, concrete flatwork, and related civil works. The award was made to a joint‑venture of Brannan Construction Company and Hamon Infrastructure, Inc., and the work will be executed on a time‑and‑materials basis with a capped contract ceiling. The solicitation included a pre‑bid meeting, a mandatory MWBE participation goal of 7 %, and is managed through the city’s electronic bidding platform (BidNet).
• Scope includes sanitary and storm‑sewer pipe replacement, manhole rehabilitation, and concrete/asphalt pavement work.
• Contract is structured as an IDIQ with individual events funded up to $6 million (pre‑qualification level).
• Vendor must meet pre‑qualification (Category 1E(4) Pipe Sewer ≥ $6 million) and provide required insurance and MWBE utilization plans.