The contract is for the removal of asbestos-containing pipe materials for the Natomas Basin Project Reach D. The estimated construction cost is $300,000.00. The contract requires a General Engineering Contractor or General Building Contractor license with a §7058.5 asbestos certification or a C-22 Asbestos Abatement Classification. The contract was awarded to the apparent low bidder, Two Rivers Demolition, Inc., with a bid of $190,550.00.
• The contract involves asbestos pipe removal
• The estimated construction cost is $300,000.00
• The contract requires a specific license and certification
• The contract was awarded to Two Rivers Demolition, Inc.