The contract is for the SPMUD – Root Control Program 2024, which involves applying chemical root treatment to 133 mainline pipe segments with diameters ranging from 4-inch to 18-inch and a total length of 33,659 feet. The contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work. The project requires traffic control measures as required by the encroachment permit issued by the governing agency. The contract was awarded to Duke's Root Control, Inc. with a base bid amount of $62,947.58.
• The project scope of work includes applying chemical root treatment to 133 mainline pipe segments.
• The contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work.
• The project requires traffic control measures as required by the encroachment permit issued by the governing agency.
• The contract was awarded to Duke's Root Control, Inc. with a base bid amount of $62,947.58.