The contract is for the AML Project 17.6B-Brierley-Glenrock-3, (McDonald South and E. Birch East), Glenrock Drilling and Grouting Project. The project involves drilling and grouting work, with a mandatory pre-bid conference and site tour. The contract was awarded to Nucor, Inc. with a total bid of $4,194,050.00. The scope of work includes drilling and grouting, with the contractor responsible for reviewing bid documents and submitting questions to the engineer.
• The contract requires the contractor to upload bid response documents to the Public Purchase site.
• The contractor must attend the pre-bid conference and site tour.
• The contract has a 5% increase for addendums.
• The contractor must submit an original bid bond or cashier's check.