This contract concerns the removal and disposal of asbestos‑containing carpet, floor tile, and mastic from two first‑floor wings of the Cuyahoga County Metzenbaum Center. Work must be performed inside a negative‑pressure containment using wet methods, with all waste double‑wrapped, sealed, and containerized before removal. The county provides water and electricity, and is responsible for removing contents, replacing a door and window with plywood, and cutting a concrete wall on the exit stairway. An optional third‑party final air‑clearance service is listed as an alternate.
• Scope: asbestos abatement, including carpet, tile, and mastic removal, containment, waste handling, and site cleaning.
• Method: negative‑pressure containment, wet‑method abatement, strict EPA/OSHA compliance.
• Owner responsibilities: utilities, content removal, door/window replacement, concrete cutting; vendor provides abatement services only.