The Pleasant Grove Boulevard Changeable Message Sign Project involves the installation of a new changeable message sign, concrete equipment pad, minor grading, power and controller cabinets, directional drilling, new conduit, and electrical work along Pleasant Grove Boulevard between Highland Pointe Drive and Roseville Parkway. The project is being managed by the City of Roseville, and the contact person is Paul Anderson, the Project Engineer. The bid submission date was October 9, 2018, and the bid bond was required. The project documents, including the bid manual, plan set, and addendums, are available for download.
• The project involves installation of a new changeable message sign and related work.
• The project is being managed by the City of Roseville.
• The bid submission date was October 9, 2018.
• The bid bond was required.
• The project documents are available for download.