This contract covers the design‑build and construction of the West Badger Mill Creek Greenway Improvements in Madison, WI. The scope includes removal of sediment, extensive grading, installation of new storm‑sewer infrastructure (12‑in. RCP pipe, catch basin, SAS), placement of rip‑rock and erosion‑control mats, top‑soil placement, native seed and vegetative matting, and full ecological restoration of the greenway corridor. The project also requires tree‑protection measures, utility coordination with the Madison Metropolitan Sewerage District, traffic‑control provisions, and site de‑watering. The award was made on a best‑value basis to Drax, Inc. for a total contract value of $581,423.42, with a projected start date of 21 September 2026.
• Storm‑water pipe upgrade and new drainage structures.
• Greenway side‑slope restoration with native vegetation and erosion control.
• Coordination with city utilities, tree‑protection, and traffic‑control requirements.
• Small‑business‑enterprise goal of 15 % of the base bid, requiring a 5 % bid bond.