This rebid seeks improvements to a used‑oil collection drop‑off center, covering site grading, erosion control, concrete sump and pad construction, curb work, sealant application, landscaping (topsoil, seed, erosion mat), and installation of bollards. The scope is broken into multiple line‑items with both lump‑sum and unit‑price pricing, and two competing contractors (State Contractors Inc and Hunzinger Construction) provided detailed cost proposals. The total base‑bid amount shown is approximately $71 K. No award decision, vendor contact details, or contract term dates are included in the excerpt.
• Core work: subgrade shaping, 48‑in. diameter concrete sump, 6‑in. concrete pad with curb, and associated site‑prep.
• Additional items: silt‑fence erosion control, topsoil/seed/erosion mat, and eight bollards.
• Competitive pricing presented side‑by‑side; the higher‑priced State Contractors Inc totals dominate the final $71 K figure.