The contract is for the reconstruction of a street, including roadway reconstruction, PCC sidewalks and ADA ramp reconstruction, storm drain construction, and other work. The engineering estimate for the project is $620,000. The contract was awarded through a competitive bidding process, with six bidders submitting proposals. The bid tabulation sheet provides a detailed breakdown of the bids received, including unit prices and total costs for each item.
• The project includes reconstruction of approximately 3,931 cubic yards of unclassified excavation.
• The project includes construction of 3253 cubic yards of crushed aggregate base.
• The project includes installation of 1423 tons of HMAC pavement.
• The project includes construction of 139 linear feet of PCC standard straight curb.
• The project includes construction of 230 linear feet of PCC standard curb and gutter.
• The project includes construction of 168 square yards of PCC sidewalk.
• The project includes construction of 27 square yards of PCC standard wheelchair ramp.