The contract is for the installation of three new County-purchased Kohler generators and Automatic Transfer Switches at three different sites, including the Wayne Brown Correctional Facility, Crown Point, and Brighton Greens. The scope of work includes site work, trenching, underground conduit installation, concrete pads, installation of Automatic Transfer Switches and associated equipment, wiring, remote monitoring setup, crane work setting up new generators, removal of existing generators, and fencing according to the plans and specifications. The contract was awarded to five vendors: Bockmon and Woody, Telstar Instruments, R&D Electric, PC Incorporated, and Designs-Build Incorporated. The contract is a lump sum contract, and the engineer's estimate is $825,000.00.
• The contract is for the installation of generators and Automatic Transfer Switches at three different sites.
• The scope of work includes site work, trenching, underground conduit installation, and more.
• The contract was awarded to five vendors.
• The contract is a lump sum contract.
• The engineer's estimate is $825,000.00.