This contract awards a single‑award, lump‑sum restoration project to improve aquatic and riparian habitat at the confluence of Jim Creek and Vos Creek in Snohomish County, Washington. The scope includes installing large and small live‑woody‑debris (LWD) structures, bank enhancements, a gravel bar, and placement of LWD pieces, along with associated mobilization, excavation, turbidity control, seeding, and force‑account allowances. The engineered estimate for the work is $594,003.77, while the successful bidder (EcoGrind Site Solutions) submitted a base‑bid total of approximately $553,462. The project is funded by RCO and DOE, requires a 5 % bid deposit, and mandates prevailing‑wage compliance.
• Primary scope: Stream restoration using engineered LWD installations and habitat enhancement.
• Funding sources: Regional Conservation Office (RCO) and Department of Energy (DOE).
• Procurement: Full and open competition under Snohomish County public‑works procurement rules; award to EcoGrind Site Solutions.