The contract is for the 7 County Center (CC7) Path of Travel Project & 5 County Center Drive (CC5) Path of Travel Ramp. The project involves replacing concrete flatwork with new accessible walkways and parking stalls, and adding an accessible path of travel ramp and lighting. The engineer's estimate for the contract is $295,246.00. The contract was bid on by several vendors, with bid amounts ranging from $154,258.00 to $546,077.00.
• The project requires the replacement of concrete flatwork with new accessible walkways and parking stalls.
• The project also requires the addition of an accessible path of travel ramp and lighting.
• The engineer's estimate for the contract is $295,246.00.
• The contract was bid on by several vendors, with bid amounts ranging from $154,258.00 to $546,077.00.