Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Engineering Services
  5. ›Engineering Bridge/Structural Design ITQ (Please Contact…

Awarded contract·City of Pittsburgh·Pennsylvania

Engineering Bridge/Structural Design ITQ (Please Contact Procurement Before Using)

Won by SAI Consulting Engineers, Inc.$5MSingle Award
Contract source

Awarded vendors

  • SAI Consulting Engineers, Inc.

Description

The City of Pittsburgh has awarded a contract to SAI Consulting Engineers, Inc. for engineering bridge/structural design services. The contract is for a term of two years, with the option to extend for up to two successive periods of one year each. The contract has a maximum annual compensation limit of $2,500,000. The scope of work includes structural analyses and design of bridges, culverts, and other related structures, as well as preparation of conceptual designs, preliminary and final engineering, and cost estimates. The contract also includes provisions for work orders, invoicing, and payment. Some key points about this contract include: • The contract is for engineering bridge/structural design services. • The contract term is two years, with the option to extend for up to two successive periods of one year each. • The maximum annual compensation limit is $2,500,000. • The scope of work includes structural analyses and design of bridges, culverts, and other related structures. • The contract includes provisions for work orders, invoicing, and payment.

Attached files

Key dates

Starts
2/1/2020
Ends
7/2/2024Renews
Duration
4 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
53140

Contract value

$5,000,000

The contract has a maximum annual compensation limit of $2,500,000. Given the contract term of 2 years with possible extensions, the total contract value could be estimated to be around $5,000,000 to $7,500,000, assuming the maximum annual limit is reached each year. However, the actual value may be lower, depending on the specific work orders and services provided.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Cobb County Department of Transportation·Georgia

Top match · 75%

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Massachusetts City of Taunton·Massachusetts

73% match

Design Services for Danforth Street Bridge

Closes 11/12/2026Opened 10/14/2026

City of Binghamton·New York

73% match

RFQ: Design Services for Structural Engineering

Closes 11/4/2026Opened 10/9/2026

Georgia City of Atlanta·Georgia

73% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

City of Charlotte·North Carolina

72% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

Cobb County, GA·Georgia

72% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Pennsylvania All Using Agencies·Pennsylvania

72% match

Conference and Event Planning ITQ

Closes 1/31/2028Opened 3/7/2018

City of Minot·North Carolina

71% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

Henry County·Georgia

71% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Georgia City of Winder·Georgia

71% match

RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599)

Closes 11/19/2026Opened 10/12/2026

Connecticut City of Meriden·Connecticut

71% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Arkansas

71% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

Agency of Transportation - Contract Administration·Vermont

70% match

Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal

Closes 4/2/2027Opened 9/15/2026

Cuyahoga County·Ohio

70% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

Georgia Department of Transportation·Georgia

70% match

NTC-484-112026

Closes 11/20/2026Opened 10/23/2026

Massachusetts Department of Transportation·Massachusetts

70% match

614107 DISTRICT 4 Scheduled and Emergency Drawbridge Operation, Repairs and Related Work at Variou

Closes 12/1/2026Opened 10/26/2026

Oregon Department of Transportation·Oregon

70% match

ON-CALL SERVICES FOR REHABILITATION OF LOAD DEFICIENT BRIDGES

Closes 12/3/2026Opened 10/29/2026

Department of Transportation·South Carolina

70% match

OPEN GRID DECK 22X60 D3 BRIDGE

Closes 11/12/2026Opened 9/29/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

70% match

Construction Contract for MSHL Rt. 102 Bridge 3.06 Rehabilitation

Closes 11/5/2026Opened 10/8/2024

U.S. Department Of Defense·United States of America

69% match

BRIDGE RLS, BENCHTO

Closes 12/1/2026Opened 10/19/2026

Pennsylvania All Using Agencies·Pennsylvania

69% match

Facility Maintenance Materials ITQ

Closes 10/31/2027Opened 8/9/2022

Trident Technical College·South Carolina

69% match

IDQ - TTC - Mechanical and Electrical Professional Services

Closes 11/11/2026Opened 10/14/2026

Division of Highways·North Carolina

69% match

DK00484 Invitation to Bid

Closes 11/18/2026Opened 10/29/2026

Georgia Henry County Board of Commissioners·Georgia

69% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

South Carolina Transportation·South Carolina

69% match

OPEN GRID DECK 22X60 D3 BRIDGE

Closes 11/13/2026Opened 9/29/2026