Coastal Carolina University's Procurement Services department awarded a contract to Convergint for the provision and replacement of a fire alarm panel at Brooks Stadium. The contract has a total potential value of $18,591.31. The contractor is required to provide an upgraded Edwards EST4 addressable fire alarm panel, which must be capable of supporting all existing peripheral building devices. The contractor must also supply a turnkey fire alarm system with all necessary accessories and perform a 100% inspection of the system upon completion.
• The contract requires the contractor to have a minimum of NICET III certification in Fire Protection - Fire Alarm Systems.
• The contractor must provide documentation of the inspection and ensure operational compatibility per NFPA 72.
• The contract includes requirements for secondary power supplies, batteries, and system primary and secondary power calculations.
• The contractor must comply with all applicable laws and regulations, including those related to sales tax and subcontractor preferences.