Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Rock Island Powerhouse 2 Drain Piping Replacement

Awarded contract·Chelan County PUD·Washington

Rock Island Powerhouse 2 Drain Piping Replacement

Won by BriVo Corp.$1MSingle Award
Contract source

Awarded vendors

  • BriVo Corp.

Description

This contract calls for the complete replacement of the sewer piping system at Rock Island Powerhouse 2, including interior station drainage pipe on the 595‑foot elevation, exterior piping at the same elevation, and interior piping on the 573‑ and 553‑foot elevations. The work requires installation of no‑hub cast iron pipe and fittings, indicating a full utility‑infrastructure overhaul. The project is a Labor & Materials solicitation with a ball‑park estimate of $1,000,000 and was awarded to BriVo Corp. for $951,300. • Scope: full replacement of sewer and drainage piping across multiple floor elevations. • Materials: no‑hub cast iron pipe and associated fittings. • Awarded vendor: BriVo Corp. (single‑award).

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
11/10/2021

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
21-04

Contract value

$1,000,000

The solicitation lists a ball‑park estimate of $1,000,000 and the awarded amount to BriVo Corp. is stated as $951,300. Assuming the award represents the majority of the work, the contract value is roughly $1 M. Minor additional costs (e.g., mobilization, contingencies) could raise the total modestly, but $1 M is a reasonable estimate based on the provided figures.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Virginia Polytechnic Institute and State University·Virginia

Top match · 67%

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

The Village of Royal Palm Beach·Florida

67% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

Oregon Tualatin Valley Water District·Oregon

67% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

67% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

67% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

66% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

U.S. Department Of Agriculture·Utah

66% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Western Virginia Water Authority·Virginia

66% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Washington Suburban Sanitary Commission, MD·Maryland

65% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

Goodwyn Mills Cawood·Georgia

65% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Rancho Palos Verdes·California

65% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

City of Ontario·California

65% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

65% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

Erie County·New York

65% match

ERIE COUNTY SEWER DISTRICT NO. 1 FRENCH ROAD AT RANDY WAY SANITARY SEWER REPLACEMENT CONTRACT NO. 52

Closes 11/17/2026Opened 10/13/2026

City of Shawnee·Kansas

65% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

65% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Charlotte·North Carolina

65% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

City of Charlotte·North Carolina

65% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

65% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Redlands·California

65% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Connecticut Town of Waterford·Connecticut

65% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

City of Charlotte·North Carolina

64% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Riverside·California

64% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Clermont County - Board of Commissioners·Ohio

64% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Riverton City·Utah

64% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026