Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Electrical System Testing - Water Filtration Plant / DPW

Awarded contract·City of Worcester·Massachusetts

Electrical System Testing - Water Filtration Plant / DPW

Won by Dagle Electrical Construction$175kSingle Award
Contract source

Awarded vendors

  • Dagle Electrical Construction

Description

This contract awards electrical system testing services for the Worcester Water Filtration Plant. The scope includes full electrical testing, short‑circuit, coordination, and arc‑flash studies, field inspections, infrared scanning, and provision of all necessary labor, equipment, and documentation, complying with IEEE, NFPA 70E, NETA, and related codes. The work must be completed within 180 calendar days of contract execution and requires the contractor to hold a DCAM eligibility certificate, provide 100 % performance and payment bonds, and adhere to prevailing‑wage, safety, and diversity requirements. • Scope: comprehensive electrical testing, power‑system studies, and labeling for a municipal water‑filtration facility. • Award: Dagle Electrical Construction (single‑award) with an estimated project cost of roughly $175 k. • Requirements: DCAM eligibility, full bonds, compliance with Massachusetts public‑works statutes, weekly certified payroll, and M/WBE utilization.

Attached files

Key dates

Bids closed
12/5/2025
Starts
11/6/2025
Ends
12/5/2025
Duration
180 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
238210
Solicitation №
8493-W6

Contract value

$175,000

The solicitation lists an estimated cost of $175,000 for the electrical testing services. The bid results show two competing bids totaling approximately $192,204, with the awardee (Dagle Electrical Construction) receiving $74,447. Considering typical public‑works pricing, the contract’s actual award value is likely close to the original estimate, around $175 k, with possible adjustments for scope changes. Therefore a reasonable ball‑park for the contract value is $175,000–$200,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Wilmington·Delaware

Top match · 71%

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

Village of Lake in the Hills·Illinois

71% match

PFAS & Iron Filtration System Design, Equipment, and Delivery

Closes 11/3/2026Opened 10/9/2026

City of Georgetown·South Carolina

70% match

WWTP Electrical Systems Documentation and Compliance Study

Closes 11/18/2026Opened 10/21/2026

City of Austin·Texas

70% match

Davis Water Treatment Plant Filter System Improvements

Rolling / TBD closeOpened 10/2/2026

Dickenson County·Virginia

69% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

U.S. Department Of Defense·Massachusetts

69% match

Individual Water Treatment Device (IWTD) Laboratory Testing

Closes 11/12/2026Opened 10/8/2026

The Housing Authority of Columbus·Georgia

69% match

Back Flow Testing

Closes 11/6/2026Opened 10/8/2026

Ohio Department of Rehabilitation and Correction·Ohio

69% match

Water Testing Services - CCI - DRC27

Closes 11/9/2026Opened 10/19/2026

Loudoun Water·Virginia

69% match

Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

City of Salisbury·Maryland

68% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Commonwealth of Kentucky·Kentucky

68% match

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

City of Ontario·California

68% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Loudoun Water·Virginia

68% match

RFP 2026-071-1400002-Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

Oregon City of Ashland·Oregon

68% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Dept of Natural Resources·Wisconsin

67% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026

U.S. Department Of Agriculture·Kentucky

67% match

Lagoon Aeration

Closes 11/19/2028Opened 11/6/2024

LA Water & Power·California

67% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026

Washington Suburban Sanitary Commission, MD·Maryland

67% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

U.S. Department Of Defense·Massachusetts

67% match

Individual Water Treatment Device (IWTD) for Reduction/Removal of Toxic Industrial Chemicals and Materials

Closes 11/12/2026Opened 10/8/2026

Maryland Washington Suburban Sanitary Commission·Maryland

67% match

Fire Flow Testing Services

Closes 11/30/2026Opened 10/29/2026

Tarrant Regional Water District·Texas

67% match

RFSOQ for Electrical Support

Closes 11/19/2026Opened 10/12/2026

Greenville County Schools·South Carolina

67% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

U.S. Environmental Protection Agency·United States of America

67% match

Capital Equipment: Purchase of (1) Millipore Sigma

Closes 11/9/2026Opened 10/29/2026

Florida Department of Corrections (FDC)·Florida

67% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026