This contract is for the complete replacement of the Mashes Sands pier in Wakulla County, Florida, funded by FEMA assistance. The work includes demolition of the existing timber and concrete pier elements, installation of new timber piles, joists, Thru‑Flow decking, concrete pile caps, and associated boardwalk repairs. The contractor must adhere to FDOT standard specifications, Davis‑Bacon prevailing‑wage rules, and Buy‑America requirements, provide performance bonds equal to 100 % of the contract amount, and hold a one‑year warranty on workmanship. The project timeline provides 250 calendar days for substantial completion and 270 days for final completion, with liquidated damages of $1,500 per day for delays.
• Scope: Demolition, timber‑pile replacement, concrete pier work, decking, boardwalk repair, and final as‑built documentation.
• Funding: $3.6 million FEMA‑assisted budget with a 5 % bid bond requirement.
• Requirements: Full compliance with FDOT specs, Davis‑Bacon Act, Buy‑America, insurance, bonding, and a 1‑year warranty.