The contract is for the Rocklin Main Replacements PH 2 project, which includes the construction and completion of approximately 1,550 feet of 16-inch C900 PVC and 800 feet of 12-inch C900 PVC water distribution main. The project also includes the installation of new fire hydrant assemblies, air/vacuum release valves, and service lines. The contract was bid on by multiple vendors, including C&D Contractors, Inc., ARB, Inc., Mozingo Construction, Inc., and Lund Construction Co. The bid opening was on July 17, 2023, at 2:00 pm. Some key features of the contract include:
• The project includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the water distribution main.
• The project includes the installation of new fire hydrant assemblies, air/vacuum release valves, and service lines.
• The contract was bid on by multiple vendors.
• The bid opening was on July 17, 2023, at 2:00 pm.
• The contract includes a pre-bid conference and a non-mandatory pre-bid meeting.