The City of Edgewater awarded a fixed‑price contract to Odyssey Manufacturing for the removal of three existing 4,100‑gal sodium‑hypochlorite HDPE tanks, demolition of associated piping, and installation of two new 4,100‑gal tanks with full piping, fittings, and required safety restraints at the Alan R. Thomas Water Treatment Facility. The scope includes temporary chemical‑feed storage, hydrostatic testing, a 5‑year warranty, and coordination with the City’s repaint interval. The project must be completed within a maximum of 300 calendar days (120 days for material delivery plus 30 days of construction, plus a 7‑day repaint interval) and carries $500 per day liquidated damages for delays. The contract is a competitive sealed‑proposal, firm‑fixed‑price award valued at $58,500 (base plus insulation alternate).
• Demolition, disposal, and replacement of sodium‑hypochlorite storage tanks (≈ 4,100 gal each).
• Installation of new HDPE tanks, Schedule 80 PVC piping, 316 SS components, and required tie‑down engineering.
• Mandatory testing, warranty, and coordination with City’s temporary chemical feed and repaint work.
• Fixed‑price lump‑sum award; liquidated damages $500/day; 180‑day proposal validity.