The contract is for the SWR - 92nd Avenue NE Forced Relocation project, which includes the installation of approximately 600 linear feet of eight-inch ductile iron water main and associated fittings. The project also includes connection to an existing two-inch water services, removal of existing valving and a hydrant, asphalt trench patching, private asphalt driveway restoration, erosion control, and landscape/surface restoration. The primary purpose of the proposed project is to relocate an existing water main to accommodate roadway improvements that are part of a larger WSDOT project.
• The project is estimated to cost $107,200.00.
• The bid opening date was April 28, 2022.
• The bidder awarded the contract is B & L Utility, Inc.
• The contract is for the installation of water main and associated fittings.
• The project requires the connection to an existing two-inch water services.
• The project includes the removal of existing valving and a hydrant.
• The project includes asphalt trench patching, private asphalt driveway restoration, erosion control, and landscape/surface restoration.