The contract is for drainage improvements in the Parkway (Mobile Homes) Subdivision (2018) for Harris County Precinct 1. The work includes the construction of a stormwater detention basin, excavation, and the installation of water lines and other appurtenances. The contract was awarded to iCON GC, LLC for a total of $15,635,000. The project is expected to be completed within one year.
Some of the key features of this contract include:
• The construction of a stormwater detention basin to help manage stormwater runoff and prevent flooding in the area.
• The excavation and removal of existing concrete and other materials to make way for the new construction.
• The installation of water lines, including 16-inch and 12-inch restrained joint pipe sections, and other appurtenances such as valves and fittings.
• The construction of concrete pavements, including a 7-inch concrete pavement and a 6-inch reinforced concrete curb.
• The installation of safety features such as construction safety fencing and off-duty uniformed peace officers.
The contract also includes provisions for the removal and replacement of existing brick mailboxes, the installation of chain link fencing, and the construction of a grand total of all the work.