The contract is for the removal of the existing sound wall between Pomegranate Avenue and Tangerine Avenue and the construction of a new sound wall at the same location. The estimated construction cost is $789,000.00. The contractor must have a General Engineering Contractor, Class A license. The contract was awarded to Sierra National Construction with a bid of $887,205.50.
• The contract includes the furnishing of all labor, materials, and equipment for the construction of the sound wall.
• The contractor must have a General Engineering Contractor, Class A license.
• The estimated construction cost is $789,000.00.
• The contract was awarded to Sierra National Construction with a bid of $887,205.50.
• The contract is for the removal of the existing sound wall and the construction of a new sound wall at the same location.