The contract is for the demolition and removal of the vault at the Sky Valley Switching Station. The project includes excavating to expose the stormwater vault, demolishing the vault, removing and disposing of reinforcing bar, prestress tendons, embedded pipe, metal items, crushing and screening to specified size, reusing as compacted fill, re-grading and restoring the site. The engineer's estimate for the project is $300,000.00. The contract was awarded to Interwest Construction, Inc.
• The project location is 19622 Tjerne PL SE, Monroe, WA.
• The project requires contractors to be on the District's Small Works Roster for the category of Substation General Site Construction, Concrete Construction or Earth Work/Drainage Work prior to bidding.
• The bid opening was on November 17, 2021, at 2:00 p.m.
• The bid proposals are under evaluation.