This contract covers the design‑build completion of critical wastewater infrastructure in the Hennings Subdivision of McHenry County, Illinois. The work includes rehabilitation of multiple sanitary sewer manholes, installation of a lift station (including generator and control equipment), and completion of the wastewater treatment plant (WWTP) building and associated process‑control systems. A modest cash allowance is provided for roof repair on the WWTP operations building, and the project must comply with county specifications, standard terms, and applicable Illinois statutes.
• Manhole rehabilitation – structural adjustments, chimney sealing, joint grouting, interior cement sealing.
• Lift station – natural‑gas‑fueled generator, automatic transfer switch, receptacle provisions.
• WWTP – generator & ATS, rotary‑lobe blower, compressors, level and flow transmitters, alarm dialers, spare equipment, interior finishes, and pond‑liner repairs.
• Contract delivered via competitive sealed bid; awarded to Carmichael Construction, Inc. for a total price of $312,451.