The contract is for the construction of the Palmdale Regional Groundwater Recharge and Recovery Project: Phase 2 Testing. The project involves the testing of groundwater recharge and recovery systems. The bid summary lists multiple vendors who submitted bids, with the lowest bid provided by All Pro Drilling, LLC at $427,490.00. The engineer's estimate for the project is $325,000.00.
• The project is located in Palmdale, California.
• A mandatory pre-bid meeting was held on March 27, 2017.
• The bid submission date was April 12, 2017.
• The project involves the construction of groundwater recharge and recovery systems.
• The contract was awarded to All Pro Drilling, LLC.