The contract is for the upgrades of the Urbana Salt Yard Facility, which includes the installation, maintenance, and removal of sediment control measures, unclassified earthwork, water main and sewer line relocation and upgrades, relocation of the existing generator and installation of a new generator, demolition of the existing salt dome, construction of a new two-story office building, construction of a 10,000-ton salt barn structure, road and material stockpile area paving, installation of lighting, motorized gate, double-pipe gate, and fencing, construction of a six truck bay barn, new wash bay and attached six truck bay barn, and a material and equipment storage barn. The contract was awarded to multiple vendors, with the lowest bid being $5,449,639.00 by Warner Construction. The contract is expected to be completed within a certain timeframe, but the exact duration is not specified.
• The contract includes multiple scopes of work, including construction, demolition, and installation.
• The contract was awarded to multiple vendors, with different bid prices.
• The contract is for a government agency, specifically the Frederick County Procurement & Contracting Department.
• The point of contact for the contract is Allen Daytner, who can be reached at (301) 600-6751 or
[email protected].