The contract is for the Module 5 Phase E Excavation project, located at the Neal Road Recycling and Waste Facility in Butte County, California. The project involves excavating future Module 5 Phase E, reconstructing and widening the adjacent access road, and furnishing and installing drainage structures. The Engineer's Estimate for the project is approximately $6,500,000. The contract was bid on by several companies, with the lowest bid amount being $5,603,080.00 by RCI General Engineering.
• The project is located at the Neal Road Recycling and Waste Facility in Butte County, California.
• The project involves excavating future Module 5 Phase E, reconstructing and widening the adjacent access road, and furnishing and installing drainage structures.
• The Engineer's Estimate for the project is approximately $6,500,000.
• The contract was bid on by several companies, with the lowest bid amount being $5,603,080.00 by RCI General Engineering.