Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN…

Awarded contract·The Metropolitan District·Connecticut

WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT

$1MAwarded 5/19/2026Single Award
Contract source

Description

The contract involves the complete relocation and replacement of water mains on Windsor Street (Hartford, CT) as part of a larger sewer‑separation project. The scope includes installing approximately 2,260 LF of 12‑in ductile‑iron water main and 35 LF of 8‑in ductile‑iron water main, transferring 33 water services (both under and over 4 inches), replacing seven fire hydrant assemblies, and abandoning roughly 3,300 LF of existing water mains. The work requires all labor, equipment, permits, and related costs, and follows the detailed specifications in Section 01010 of the bidding documents. • Installation of new ductile‑iron water mains with restrained joints. • Transfer of multiple water services and replacement of fire hydrants. • Abandonment of existing water main infrastructure on Windsor, Sanford, and Main Streets.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
3/9/2026
Intent to award
5/19/2026
Awarded
5/19/2026
Starts
5/19/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2024B-20

Contract value

$1,000,000

The solicitation does not disclose a contract value. Estimating based on typical costs for ductile‑iron water main installation (~$300 per foot for 12‑in pipe), the 2,260 LF of new main alone would be about $678,000. Adding the 35 LF of 8‑in pipe (~$250/ft) contributes roughly $9,000. Service transfers, hydrant replacements, and abandonment activities can easily add another $250,000‑$300,000. Summing these components yields an approximate total in the range of $950,000‑$1,100,000. A conservative midpoint estimate of $1,000,000 is therefore provided. Factors influencing the estimate include material prices, labor rates in Connecticut, the complexity of restrained‑joint installation, and the extensive demolition/abandonment scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Hastings Utilities·Nebraska

Top match · 77%

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Cincinnati - Purchasing Division·Ohio

75% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

Hastings Utilities·Nebraska

74% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Thomas·Oklahoma

73% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

City of Elgin·Illinois

73% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Elgin·Illinois

73% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Missouri

73% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Georgia City of Lagrange·Georgia

73% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

Connecticut Town of South Windsor·Connecticut

72% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Ontario·California

72% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Catawba Regional Council of Governments·South Carolina

72% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Town of Eatonville·Florida

72% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Ketchikan·Alaska

71% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of DeLand·Florida

71% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Cincinnati·Ohio

71% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

Erie County·New York

71% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

City of Rosenberg·Texas

71% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of DeLand·Florida

71% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

City of Frostproof·Florida

70% match

Septic to Sewer - W 9th St

Closes 12/8/2026Opened 10/26/2026

City of Bellevue·Washington

70% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Philadelphia·Pennsylvania

70% match

PW Bid 2521-SEWER RECONSTRUCTION and RELAY of WATER MAINS in MANTON ST FROM S. 8TH ST to S. 7TH ST

Closes 11/10/2026Opened 10/28/2026

City of Alhambra·California

70% match

N2M26-94 SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE

Closes 11/5/2026Opened 10/8/2026

Connecticut Town of Waterford·Connecticut

70% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

City of Frostproof·Florida

70% match

Septic to Sewer - Wood and Palmetto Ave

Closes 12/8/2026Opened 10/26/2026