The contract involves the complete relocation and replacement of water mains on Windsor Street (Hartford, CT) as part of a larger sewer‑separation project. The scope includes installing approximately 2,260 LF of 12‑in ductile‑iron water main and 35 LF of 8‑in ductile‑iron water main, transferring 33 water services (both under and over 4 inches), replacing seven fire hydrant assemblies, and abandoning roughly 3,300 LF of existing water mains. The work requires all labor, equipment, permits, and related costs, and follows the detailed specifications in Section 01010 of the bidding documents.
• Installation of new ductile‑iron water mains with restrained joints.
• Transfer of multiple water services and replacement of fire hydrants.
• Abandonment of existing water main infrastructure on Windsor, Sanford, and Main Streets.