Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maine guideMaine Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maine
  4. ›Construction
  5. ›Pavement Rehabilitation, Safety Improvements & Pipe End…

Awarded contract·Maine Turnpike Authority·Maine

Pavement Rehabilitation, Safety Improvements & Pipe End Repairs MM 51.2 to 54.5

Won by Coastal Road Repair, LLC$15MSingle Award
Contract source

Awarded vendors

  • Coastal Road Repair, LLC

Description

This contract involves pavement rehabilitation and safety improvements on the Maine Turnpike, including milling and filling of travel lanes and median, removal of excess material, cleaning of catch basins, replacement of catch basin tops, and installation of concrete aprons. The work also includes guardrail adjustments, pavement markings, and maintenance of traffic. The contract requires compliance with various regulations, including wage rates and labor laws, and permits from the Army Corps and the Maine Department of Environmental Protection. The contract has a completion date of September 17, 2025, and includes provisions for payment, liquidated damages, and maintenance of traffic control devices. The key aspects of this contract are the rehabilitation of the pavement, safety improvements, and the maintenance of traffic control devices. Some key points to consider are: • The contract involves a significant amount of construction work, including milling and filling of travel lanes and median. • The contract requires compliance with various regulations, including wage rates and labor laws. • The contract has a completion date of September 17, 2025. • The contract includes provisions for payment, liquidated damages, and maintenance of traffic control devices. • The contract is for a single award, and the vendor is Coastal Road Repair, LLC.

Attached files

Key dates

Ends
9/17/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
2025.03

Contract value

$15,000,000

The contract value can be estimated based on the bid prices provided in the contract documents. The total bid price for the contract is not explicitly stated, but the prices for individual items can be used to estimate the total value. For example, the bid price for removing pavement surface is $160,200 per square yard, and the approximate quantity is 160,200 square yards. This would put the total value for this item at $160,200 x 160,200 = $25,683,600,000, which is likely an overestimation. A more realistic estimate can be made by considering the prices for all items and the approximate quantities. Based on the provided information, a rough estimate of the contract value could be around $10 million to $20 million. However, without more detailed information, it is difficult to provide a precise estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ontario·California

Top match · 75%

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Illinois Tollway·Illinois

74% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

City of Fargo·North Dakota

73% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Illinois Tollway·Illinois

73% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

City of Vernon·California

73% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Salina·Kansas

73% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

City of Broken Arrow·Oklahoma

72% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Georgia City of Sandy Springs·Georgia

72% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Laguna Hills·California

71% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Modesto, CA·California

71% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 11/3/2026Opened 9/1/2026

City of Saint Peter·Minnesota

71% match

Saint Peter, City of 2026 Lead Service Line Replacement BMI No. 26X.142592

Closes 11/13/2026Opened 10/16/2026

City of Stillwater·Oklahoma

71% match

Full Depth Repair - 27TR06

Closes 11/18/2026Opened 10/17/2026

City of Ontario·California

71% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Texas City of San Antonio·Texas

70% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Burlington Township·New Jersey

70% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

Port of Tacoma·Washington

70% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

Goodwyn Mills Cawood·Georgia

70% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Shawnee·Kansas

70% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Georgia Department of Transportation·Georgia

70% match

T32-D4-PavePRes-Coffee-SR268-193832

Closes 11/5/2026Opened 10/21/2026

City of Culver City·California

70% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Torrance·California

70% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of Waco·Texas

70% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

City of San Antonio·Texas

70% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

City of San Antonio·Texas

70% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

NYS East Fishkill, Town of·New York

70% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026