The Church Street Improvements Project involves the reconstruction of approximately 3,000 linear feet of street, including curb and gutter replacement, driveway replacement, sidewalk installation, storm sewer installation, sanitary sewer replacement, street light installation, and lawn restoration. The project includes work on Church Street, Church Terrace, and Church Circle. The contract was bid on by several contractors, with the lowest bid being $2,147,339.50 by Amino Brothers Co., Inc. The contract also includes a 10% owner's contingency allowance. The project requires the removal of existing pavement, driveways, sidewalks, and structures, as well as the installation of new concrete curbs, gutters, and sidewalks.
• The project includes the removal of approximately 9,878 square yards of existing pavement.
• The project includes the removal of approximately 2,157 square yards of existing driveways.
• The project includes the removal of approximately 1,026 square yards of existing sidewalks.
• The project includes the installation of approximately 6,176 linear feet of concrete curb and gutter.
• The project includes the installation of approximately 186 square yards of concrete drive.
• The project includes the installation of approximately 1,042 square yards of concrete sidewalk.