The Melstone Valley Stormwater Management Retrofit project involves the labor, material, equipment, and services necessary for the retrofit of the Melstone Valley Stormwater Management Facility. The project is federally funded and must comply with federal and state regulations. The contract was awarded to Magstone with a grand total lump sum of $895,000.00. The project includes items such as rock excavation and grading. The contract requires the contractor to provide all necessary labor, equipment, and materials to complete the project. Some key points to note are:
* The project funding includes State and Local Fiscal Recovery Funds.
* Bidders must be pre-qualified by the Carroll County Department of Public Works prior to bid opening.
* The bidder must be approved for the type of work applicable to the project.
* The pre-qualification application forms must be submitted to the Bureau of Engineering a minimum of ten (10) days in advance of the bid opening.
* The contract requires the contractor to comply with federal and state regulations.
* The contract includes a lump sum bid for the Melstone Valley SWM Facility Retrofit.
* The contract requires the contractor to provide all necessary labor, equipment, and materials to complete the project.
• The project includes items such as rock excavation and grading.
• The contract was awarded to Magstone with a grand total lump sum of $895,000.00.
• The contract requires the contractor to comply with federal and state regulations.
• The project funding includes State and Local Fiscal Recovery Funds.