The East Elk Grove Water Treatment Plant ReCoating Project Phase 1 involves the recoating of one ground level steel water storage tank and one ground level steel backwash tank, as well as the installation of a perimeter guard rail atop both tanks. The project requires the furnishing of all labor, materials, and equipment for the recoating and installation work. The contract was awarded to CalSierra Construction with a bid price of $659,685.00. The project is located at 9960 Waterman Road, Elk Grove, CA 95624.
• The project includes surface preparation of the interior and exterior surfaces of the water storage tank and backwash tank.
• The project includes application of the specified exterior and interior coating systems on both tanks.
• The project includes installation of a new guard rail atop both tanks.
• The project requires compliance with all health, safety, and other applicable federal, state or local regulations.
• A pre-bid conference was held on June 9, 2016, at the project site.
• The contract requires a valid California contractor's license with the classification identified above.
• The contract requires the submission of a Statement-of-Qualifications and other information as specified as part of the bid.