The contract is for the hauling and disposal of wastewater sludge from two treatment plants, Fishcreek WWTP #25 and Upper Tusc WWTP #36. The contract was awarded to Quasar Energy Group and Kimble Recycling and Disposal Inc. The estimated cost of the contract is $330,000.00. The scope of work includes the hauling of sludge from the treatment plants to a solid waste landfill, where it will be disposed of. The contract also includes the return of the County's trailers to the treatment plants.
• The contract is for a period of one year, with an option to renew for an additional year.
• The contractor is required to provide a minimum of 20 tons per load.
• The contractor is also required to provide a backup disposal location in case the primary location is unavailable.
• The contract includes the provision of a bid bond and a performance bond.
• The contract also includes the provision of insurance, including liability insurance and workers' compensation insurance.