This contract is a design‑build procurement for the complete mechanical and electrical upgrade of the FedEx Maintenance Hangar at Ted Stevens Anchorage International Airport. The awardee is responsible for engineering, permitting, fabrication, installation, testing, and commissioning of fire‑suppression, HVAC, boiler, pump, compressed‑air, and electrical power‑distribution systems, including seismic bracing and compliance with FM‑Global fire‑protection standards. The project budget is capped at $2.7 M, with a firm‑fixed‑price structure, and the work window runs from early April 2016 through the end of September 2016. Key requirements include mandatory use of Johnson Controls control‑system equipment, adherence to strict airport security protocols, and delivery of comprehensive as‑built documentation and O&M manuals.
• Full design‑build scope: fire‑pump replacement, boiler and heating system overhaul, air‑compressor and compressed‑air upgrades, electrical power distribution and motor‑starter work.
• Mandatory vendor: Johnson Controls for control‑system hardware; no substitutions allowed.
• Tight schedule: NTP expected 7 Apr 2016, substantial completion 19 Aug 2016, final close‑out 30 Sep 2016.